BUILD YOUR CUE SHEET

Stage Cue Sheet Builder

Build a chronological cue sheet with department, trigger, standby time and duplicate cue-ID checks.

Local calculationsEditable projectsCSV & reports
  1. 1List your cues
  2. 2Read the answer as you type
  3. 3Download or print it

Loading the worked example…

Assumptions

Results update as you type. Example figures are illustrative.

Your working data

Edit cells directly or import a CSV. Download “Input CSV” for the required column names. Up to 200 rows; scroll the table sideways for additional fields.

What this model includes

Planning export only; no connection to show-control equipment. Time-based standby is an aid, while the entered trigger remains the operator instruction.

Import and save safely

CSV imports use your current assumptions. Project files restore assumptions, rows and saved scenarios. No automatic saving: download a project before closing this page. Imports are limited to 10 MiB and 200 rows. Calculations run in your browser; the site’s advertising and analytics follow its privacy policy.

Using Stage Cue Sheet Builder

Build a chronological cue sheet with department, trigger, standby time and duplicate cue-ID checks.

  1. Set standby lead seconds.
  2. Add one row for each cue in the table.
  3. Read the cue sheet at the top, then download the result.

Example

The worked example includes LX1, S1, LX2.
Change the first standby lead seconds setting and compare the result with a saved baseline.

Questions & answers

What does Stage Cue Sheet Builder calculate?

Build a chronological cue sheet with department, trigger, standby time and duplicate cue-ID checks.

What are the important limitations?

Planning export only; no connection to show-control equipment. Time-based standby is an aid, while the entered trigger remains the operator instruction.

Can I continue my work later?

Yes. Save a project JSON file and reopen it with Import CSV / project. It contains the working data, assumptions and up to four scenarios. Nothing is saved automatically.

What CSV columns do I need?

cue, department, seconds, trigger, action. Download Input CSV for a compatible example. CSV imports keep your current assumptions.

Are these example figures current industry benchmarks?

No. They are illustrative values to demonstrate the model. Replace them with figures appropriate to your situation.

Help improve this tool

Report a problem or suggest an improvement

Describe the issue without pasting private tool input. Feedback goes to our admin inbox.

Find another tool · Read practical guides