SPOT OVERLOADED DAYS

Editorial Capacity Calendar

Schedule content preparation backwards from publication dates and find overloaded production days.

Local calculationsEditable projectsCSV & reports
  1. 1List your content
  2. 2Read the answer as you type
  3. 3Download or print it

Loading the worked example…

Assumptions

Results update as you type. Example figures are illustrative.

Your working data

Edit cells directly or import a CSV. Download “Input CSV” for the required column names. Up to 200 rows; scroll the table sideways for additional fields.

What this model includes

Effort is spread evenly over preparation calendar days before publication. Weekends are included; this is a workload forecast, not an assignment optimizer.

Import and save safely

CSV imports use your current assumptions. Project files restore assumptions, rows and saved scenarios. No automatic saving: download a project before closing this page. Imports are limited to 10 MiB and 200 rows. Calculations run in your browser; the site’s advertising and analytics follow its privacy policy.

Using Editorial Capacity Calendar

Schedule content preparation backwards from publication dates and find overloaded production days.

  1. Enter how many team hours you have per day.
  2. List each piece with owner, publish date, draft, edit and design hours, and preparation days.
  3. See overloaded days in the chart at the top, then download the schedule.

Example

The worked example includes Launch guide, Comparison article, Weekly digest.
Change the first team hours per calendar day setting and compare the result with a saved baseline.

Questions & answers

What does Editorial Capacity Calendar calculate?

Schedule content preparation backwards from publication dates and find overloaded production days.

What are the important limitations?

Effort is spread evenly over preparation calendar days before publication. Weekends are included; this is a workload forecast, not an assignment optimizer.

Can I continue my work later?

Yes. Save a project JSON file and reopen it with Import CSV / project. It contains the working data, assumptions and up to four scenarios. Nothing is saved automatically.

What CSV columns do I need?

title, owner, publish, draft, edit, design, lead. Download Input CSV for a compatible example. CSV imports keep your current assumptions.

Are these example figures current industry benchmarks?

No. They are illustrative values to demonstrate the model. Replace them with figures appropriate to your situation.